Our Projects
Main Outfall Drainage (MOD) Water Treatment Plant from the air
Aerial footage of the plant under construction: process tanks, treatment buildings, steel structures and glass-lined storage tanks.
A sample of recent work across southern and middle Iraq
Our full project list is too long for a single page, so it is limited here to recent representative work. Ask us for the complete reference list for your sector.

Main Outfall Drainage (MOD) Water Treatment Plant
Multidisciplinary civil, structural, mechanical, piping, electrical and related construction works, executed through multiple call-off packages: reinforced concrete process tanks, treatment buildings, pipe racks, drainage, water-intake works and plant infrastructure.

Water Intake Works
Excavation, embankment shaping and stone rip-rap armor placement for the protected water-intake channel feeding the Main Outfall Drainage (MOD) Water Treatment Plant.

Nano-Filtration & Marshal Buildings
Construction of Nano-Filtration and Marshal Building facilities, including civil and structural works, mechanical/electrical interfaces, embedded items, HVAC, fire suppression, steel-structure elements and seven rolling doors.

Grit Removal, Stabilization & Ultrafiltration Tanks
Construction works for three reinforced concrete process tanks, including civil, mechanical, electrical, embedded/puddle flange interfaces, and steel-structure interfaces.

Clarifier & Two Thickener Tanks
Construction works for one clarifier tank and two circular thickener tanks, including reinforced concrete works, mechanical and electrical interfaces, and embedded/puddle works required for process integration.

Drum Screen, Sludge & Chemical Pit Buildings
Construction of the Drum Screen Building, Sludge Building, and Open/Close Chemical Pit facilities as part of the wider water treatment call-off packages.

Compressed Air Building & Chemical Dosing
Compressed Air Building, Chemical Dosing 1 & 2, Shades, and Slab on Grade for external site equipment.

UF Pipe Racks (UF1 & UF2)
Construction of the foundation, steel structure, and accessories of the pipe rack serving Ultra-Filtration units UF1 and UF2.

NF Pipe Rack
Construction of the foundation, steel structure, and accessories of the pipe rack serving the Nano-Filtration (NF) building.

Transformers & High-Voltage Substation Works
Construction and installation of 18 transformers, including two high-voltage 33kV/11kV units, with the remainder stepping from 11kV into 220kV.

Pump Skids
Installation of pump skids with motors, piping and overhead crane under steel-framed canopies.

Anti-Surge Vessels
Erection and installation of the anti-surge vessels protecting the plant's pumping and pipework.

GLS Tanks
Reinforced concrete foundations for the glass-lined steel (GLS) storage tanks, with associated site works.

Office of Statistics, Suq Al-Shyookh
Building construction works for the Office of Statistics project, including civil and building works, labor and material supply, quality and safety compliance, and completion per contract requirements.

Ghernata School Project
Procurement and construction works for a two-story, twelve-classroom school complex — classrooms, walkways, sports field areas, laboratory facilities, administrative buildings and external works.

Office Building for the General Inspector
Turnkey EPC delivery for the Dhi Qar Oil Products Distribution Company: civil and structural works, mechanical systems, HVAC, firefighting and fire suppression, electrical, plumbing, architectural finishing, testing/commissioning support and final handover.

Streets & Sewage Services, Al-Jibayish
Street construction served by sanitation infrastructure in the Bani Askari district and Al-Hai Al-Askari area of Al-Jibayish district.

Al-Bid'a Connector Road, Basra (8.75 km)
Supply and execution of the connecting road between the Al-Bid'a project and the preemptive project in Basra Governorate, spanning 8.75 km.

Road Projects
A recurring line of work for AAE — asphalt paving, compaction and road-surfacing across multiple sites, from access roads at industrial facilities to urban connector roads, using a dedicated paving and compaction fleet.

Playgrounds, Al-Gharraf District
Construction of playgrounds on properties belonging to Al-Gharraf district.

Petronas Football Field, Al-Gharraf Oil Field
Construction of a football field for Petronas Malaysia at the Al-Gharraf oil field.

Hydraulic Structures, Hor Al-Hammar
Four hydraulic structures with complete civil and mechanical works in Hor Al-Hammar, Al-Jibayish — part of the marshlands rehabilitation program.
Construction in progress
Short clips from the Main Outfall Drainage (MOD) Water Treatment Plant site — pile driving, concrete pours, formwork and structural steel erection, day and night.
Pile Driving
Piling works underway at the WTP site.
De-Aeration Tank Lift
Crane placement of the de-aeration vessel.
UF Tank Formwork
Night-shift formwork and scaffolding on the Ultra-Filtration tank.
Night Concrete Casting
Concrete pour underway on a night shift at the WTP.
Night Shift Operations
A night shift in full swing across the WTP site.
Site Walkthrough
A walk across the completed process tanks at dusk.
Looking for a reference project in your sector?
We can share detailed case studies and contact references on request.